Northmead Public School - 10.3 kW Solar Power

Challenge

  • Group 298

    Utilise the NSW Department of Education grant

  • Group 298

    To lead by example in their sustainability initiatives

  • Group 298

    Partner with a provider with quality tradesman and with extensive experience in the industry

Client

northmead_logo_1401926858524_m

Location

Northmead - NSW

Product

  • Panels: x106 Canadian Solar (285 W)
  • Inverters: SMA Sunny Tripower 25000TL-30

Solution

  • The school will be energy positive with 36 Canadian Solar (285 W) panels which brings their total PV capacity to 10.3 kW.
  • The solar power system also features the Fronius Symo 10.0-3-M inverter to further increase the efficiency of the system.

Result

  • The solar power system installation was successfully completed on March 26, 2019.
  • Achieved significant cost savings by powering the administration building with solar PV, which is at the heart of the school’s operations.
  • The estimated savings per annum is AU $2,185.
  • Their return on investment is expected to be 4.7 years.